0086-535-6266178  felixtools@fmore-ma.com
Language: english

LASER CHUCKS

LASER CUTTING MACHINE CHUCKS

  • LASER CHUCKS
  • 0086-18615009310
  • felixtools@fmore-ma.com
  • Feature: Simple structure convenient installation strong applicability clean and durable reliable clamping durable precision and etc. to improve operation efficiency reduce manufacturing cost.
  • FEEDBACK

The product is specially designed for laser tube cutting equipment. The product itself can be used as an independent rotating spindle, and a chuck in it can firmly clamp workpiece and rotate simultaneously,
The quick clamping and looseing actions can be realized by side rotation and air intake, Disconnect the air source berfore operation.
The chuck can work in full stroke without additional adjustment of four claws. It can clamp all applicable pipe fittings and improve production efficiency.
Adopting a fully closed structure, the chuck has better stabilty and wear resistance. With cross roller beraing, it has longer service life, higer rotary accuracy and repeated positioning accuracy than tradtional laser chuck, and greater clamping force than similar products  in the market. In the case of low air, a smaller calmping force can be obtained, thereby satisfying the need of processing thin-walled pipe fittings.  
The product is widely used in special laser pipe cutter and other pipe processing machine systems.





RFQ:
Q: What can I get the price?
A: We usually quote within 2 hours after we get your inquiry. If you are very urgent to get the   price, please tell us in your email so that we will regard you inquiry priority.

Q: What is your term of delivery?
A: We accept EXW, FOB Qingdao  etc or CFR QINGDAO etc. You can choose the one which is the most convenient or cost effective for you.

Q: What about the lead time for the mass production?
A: Honestly, it depends on the order quantity and the season you place the order.

Q: Are you trading company or manufacturer ?
A: We are factory and trade company.

Q: How long is your delivery time?
A: Generally it is 5-10 days if the goods are in stock. or it is 15-20 days if the goods are not in stock, it is according to quantity.

Q: What is your terms of payment ?
A: Payment<=1000USD, 100% in advance. Payment>=1000USD, 30% T/T in advance ,balance before shippment.